Home > Case Studies > Wardrobe By Syra, Eid Message Campaign

Wardrobe By Syra, Eid Message Campaign

Facebook Messenger Ads · Bangladesh

Objective

Drive Eid orders via Facebook messaging, targeting Bangladeshi women who prefer to confirm purchases through direct chat.

Strategy

  • Ran a Message Campaign focused on direct order conversion via Facebook Messenger
  • Created 4 ad sets: Advantage Audience, Page Engaged Audience, Lookalike (3s Video Viewers), Lookalike (365-day Engagement)
  • 16 different ad creatives tested with varied visuals, hooks, and CTA styles
  • A/B testing and tracked performance by cost-per-result, reach, and impressions

Execution

This campaign focused on high-intent audience behavior typical in Bangladesh where orders are placed over messages rather than website checkout. Each creative emphasized Eid timing, design clarity, and message-based ordering. The best-performing ad set was Lookalike (3s Video Viewers) at 151K reach and $0.02 per message.

All four ad sets stayed below $0.04 cost per result. The total spend was $135.49 for 225,566 reach and 591,208 impressions. This campaign ran alongside the larger Eid ul Adha campaign and served as a focused test on message conversion efficiency with a smaller creative set.

Wardrobe By Syra Eid message campaign performance

Eid message campaign — 591K impressions on $135 spend

591K

Total Impressions

16 creatives · 4 ad sets · all under $0.04/message

$0.03

Avg cost per message

$0.02

Best ad set (Lookalike 3s Video Viewers)

225,566

Reach

591,208

Impressions

$135.49

Total spend

← Back to all case studies